Specifications
General
a. Turn oil valve control knob to OFF, disconnect the
copper pipe connection at the burner base and
withdraw. Draw off the oil in the burner base.
Alternatively the oil can be sucked out using an
aspirator.
b. Fit the burner wicks, vapour chamber, sealing plate
and perforated shell assembly with top baffle assembly,
checking that the shell assemmbly seats airtightly on
the burner base.
NOTE: ENSURE ‘CUT-OUTS’ ON BURNER WICKS
LINE UP SITH OIL CHANNELS ON BURNER BASE
(SEE FIG. 8).
c. Replace the burner and reconnect oil pipe.
d. Ensure burner shell assembly locations are seated
airtight by carefully holding the assembly and turning
it in a restricted manner.
1. After checking the burner is level and that the oil is
the correct depth in the burner disconnect the oil feed
pipe to the burner and attach adaptor for measuring
oil rates by the DRIP FEED METHOD.
2. Turn the cooker oil control valve knob C on the oil
control valve to No. 6 setting to establish oil flow,
allowing 2 min. Always set low fire rate first.
3. Turn the cooker oil control valve knob C on the oil
control valve to No. 1 setting - check low fire setting -
this should be 4.5cc/min for the boiler model or
3.5cc/min for the non-boiler model.
NOTE: ALLOW 7 MINUTES FOR THE FLOW TO
STABILISE BEFORE TAKING THE RATE. IF THE
RATE IS INCORRECT THEN ALLOW 2 MINUTES
BETWEEN RE-SETTING AND THE NEXT RATE.
4. If the rate is incorrect then turn the low fire adjusting
screw as shown on the cover plate to increase or
decrease the flow. See Fig. 12.
Turn adjusting screw anti-clockwise to increase flow
and clockwise to decrease flow.
5. Now turn the cooker oil control valve knob C on the
oil control valve to No. 6 (High Fire) and check rate -
AGAIN ALLOW TIME AS ABOVE FOR THE OIL
RATE TO SETTLE. If incorrect adjust high fire rate
by turning the high fire adjusting screw as shown on
the cover plate. See Fig. 10. This should be 12cc/min
for the boiler model or 8.5 to 9.0 cc/min for the non-
boiler model. ALLOW TIME FOR RATE TO SETTLE.
Installation Instructions
COMMISSIONING AND TESTING
CHECKING BURNER FLOW RATES
8
Fig. 11
Fig. 12 DESN 515833










