User guide
Table Of Contents
- Chapter 1: Introduction
- Chapter 2: Installation
- Chapter 3: Operation – User Functions
- Chapter 4: Operation – Administrator Functions
- The Administration Menu
- Guidelines for System Configuration
- System Configuration
- Video Redirection (Forced Video)
- Channel Association for Multiple Video
- User Configuration
- Channel Configuration
- User Station Profile
- Group Settings (Access Rights)
- Recommendations
- System Reboot and System Reset
- Network Settings
- Autoscan and Autoskip
- Power Management
- Paragon II Network Port
- Chapter 5: Paragon II and P2ZCIMs/Z-CIMs
- Chapter 6: Managing IBM BladeCenter Servers
- Chapter 7: Configurations
- Chapter 8: Firmware Upgrade
- Appendix A: Specifications
- Appendix B: User Station Direct Mode
- Appendix C: Tiering and Compatibility
- Appendix D: Paragon II Rack Mount
- Appendix E: Connecting Serial Devices to Paragon II System
- Appendix F: Extra Keyboard/Mouse Information and Settings
- Appendix G: Recommendation for Better Video Quality
- Appendix H: Other Components Working with Paragon II
- Appendix I: Troubleshooting

24 PARAGON II USER GUIDE
2. Power off the Main Switching Unit.
3. Connect the stacking cable between Main Switching and Stacking Units.
4. Power on the Stacking Unit first.
5. Then power on the Main Switching Unit.
Installing a HubPac
P2-HubPac is available for use with Paragon II. HubPac units allow users of different Paragon
switching units to access the same server(s). Each five-port cluster on a HubPac is capable of
connecting a server to up to four Paragon matrix switches.
CIM models capable of connecting to a P2-HubPac include:
• P2CIM-APS2
• P2CIM-AUSB
• P2CIM-ASUN
• UKVMC