User guide
Table Of Contents
- Chapter 1: Introduction
- Chapter 2: Installation
- Chapter 3: Operation – User Functions
- Chapter 4: Operation – Administrator Functions
- The Administration Menu
- Guidelines for System Configuration
- System Configuration
- Video Redirection (Forced Video)
- Channel Association for Multiple Video
- User Configuration
- Channel Configuration
- User Station Profile
- Group Settings (Access Rights)
- Recommendations
- System Reboot and System Reset
- Network Settings
- Autoscan and Autoskip
- Power Management
- Paragon II Network Port
- Chapter 5: Paragon II and P2ZCIMs/Z-CIMs
- Chapter 6: Managing IBM BladeCenter Servers
- Chapter 7: Configurations
- Chapter 8: Firmware Upgrade
- Appendix A: Specifications
- Appendix B: User Station Direct Mode
- Appendix C: Tiering and Compatibility
- Appendix D: Paragon II Rack Mount
- Appendix E: Connecting Serial Devices to Paragon II System
- Appendix F: Extra Keyboard/Mouse Information and Settings
- Appendix G: Recommendation for Better Video Quality
- Appendix H: Other Components Working with Paragon II
- Appendix I: Troubleshooting

104 PARAGON II USER GUIDE
Recovering User Stations after Upgrade Failure
As long as your User Station has the failsafe capability, you can restore its function whenever the
upgrade failure occurs.
1. Power cycle the User Station.
2. Repeat the same upgrade process until the upgrade is finished successfully.