User manual

CHAPTER 5: PARAGON II AND Z-CIMS 55
All Paragon II components must be powered ON prior to P2ZCIM tier installation. All computers in the
P2ZCIM chain must be powered OFF prior to installation.
Important: For Paragon I UMT242, 442, 832 and 1664, hardware III and Paragon II
firmware and Paragon II UMTs:
- For P2ZCIM chains up to and including 20 individual ZCIM units, at least one P2ZCIM
must be powered ON
- For P2ZCIMs chains from 21 up to and including 42 ZCIM units, at least 15 P2ZCIMs
must be powered ON
- Following these guidelines ensures that there is enough power to support all
P2ZCIMs in a chain.
Connect a P2ZCIM as a Tier:
1. Connect a Category 5e UTP cable to the channel port on the Paragon II UMT unit reserved for the
P2ZCIM chain.
2. Connect the other end of this Category 5e UTP cable to the UTP OUT (O) port on a P2ZCIM, which
will be the first CIM in the chain.
3. Connect a computer to the first P2ZCIM.
a. Connect the 6-pin mini-DIN keyboard and mouse and HD15 video connectors on the P2ZCIM to
computer’s keyboard, mouse, and video ports.
b. Place the Z-CIM Terminator in the P2ZCIM’s UTP IN (I) port.
c. Power ON computer.
Attach new P2Z-CIM to an Existing P2ZCIM Chain:
1. Remove P2ZCIM Terminator from the last P2ZCIM’s UTP IN port and set aside.
2. Connect a Category 5e UTP cable to UTP IN port on the P2ZCIM that is currently last in the chain.
3. Connect the other end of this Category 5e UTP cable to the UTP OUT port on the next Z-
CIM/computer currently being added to the chain.
4. Place the Z-CIM Terminator in the added P2ZCIM’s UTP IN port.
5. Power ON computer.
Perform Channel Configuration:
1. At a User Station Login Menu, type admin in the User Name field and press Enter.
2. Type raritan (all lowercase) in the Password field and press Enter.
3. Press F5 to go the Administration Menu and select the Channel Configuration submenu.
4. Use the and or the Page Up and Page Down keys to highlight the Paragon II channel where the
P2ZCIM was just added.
5. Ensure that the Device field reads P2ZCIM.
6. If a more descriptive name is desired:
a. Hold the Shift key and press Tab to go back to the Name column, then press Enter - the highlight
will turn blue.
b. Edit the default name and press Enter - the highlight will turn green as you begin to type.
c. Press S to save the change, or press Esc to exit without saving.
7. Press F2 to go to the Selection Menu to validate that the second-tier P2ZCIM is properly configured.
Select the tiered Z-CIM device and press Enter.
Resize an Existing P2ZCIM Chain:
The size limit for a P2ZCIM chain is 42 units. When adding a new P2ZCIM to the chain, you must resize
the chain in the OSUI so that the Paragon UMT can ‘see’ the newly-added CIM.
1. At a User Station Login Menu, type admin in the User Name field and press Enter.
2. Type raritan (all lowercase) in the Password field and press Enter.
3. Go to the Channel View screen (view selection by channel).
4. Press the Home key.
5. Press the F5 key.
6. Go to the Channel Configuration screen.
7. Use the and or the Page Up and Page Down keys to select the P2ZCIM chain you wish to resize.