User manual
CHAPTER 5: PARAGON II AND Z-CIMS 53
Attach Z-CIM to Computer to be Added:
For UKVMSPD Z-CIM:
a. Connect the 6-pin mini-DIN keyboard and mouse and HD15 video connectors on the UKVMSPD
Z-CIM to computer’s keyboard, mouse, and video ports.
For UKVMSC Z-CIM with local port:
a. Connect CCPnn cable’s 6-pin mini-DIN and HD15 connectors to computer’s keyboard, mouse,
and video ports.
b. Connect DB25 male end of CCPnn cable to DB25 female port on back of Z-CIM (UKVMSC).
Attach new Z-CIM to the existing Z-CIM chain:
1. Remove Z-CIM Terminator from the last Z-CIM’s UTP IN port and set aside.
2. Connect a Category 5e UTP cable to UTP IN port on the Z-CIM that is currently last in the chain.
3. Connect the other end of this Category 5e UTP cable to the UTP OUT port on the next Z-
CIM/computer currently being added to the chain.
4. Place the Z-CIM Terminator in the added Z-CIM’s UTP IN port.
5. Power ON computer.
6. Optional: Connect a local user console to the UKVMSC Z-CIM.
Name Computer:
1. At the Selection Menu, press F5 to go to the Administration Menu.
2. Select the Channel Configuration submenu.
3. Select the Z4200U device channel.
4. Press G to bring up a Channel Configuration menu for the Z-CIM chain.
5. Use the and keys to highlight the Name field of the computer just connected via Z-CIM. The
channel for this computer is displayed in green, and the highlight will turn yellow when it is selected.
6. Press Enter - the highlight will turn blue.
7. Type the desired computer name - the highlight will turn green as you begin to type.
8. Press Enter - the highlight will turn yellow.
9. Press S to save the new name.
Verify and Save Changes:
1. Press F2 to return to the Selection Menu.
2. The Selection Menu will display with the new computer name highlighted in white.
3. Press Enter to switch to this selected computer.
4. Normal computer access and operation indicates a successful connection.
Important: For Paragon I UMT242, 442, 832 and 1664, hardware III and Paragon II
firmware and Paragon II UMTs:
- For P2ZCIM chains up to and including 20 individual ZCIM units, at least one P2ZCIM
must be powered ON
- For P2ZCIMs chains from 21 up to and including 42 ZCIM units, at least 15 P2ZCIMs
must be powered ON
- Following these guidelines ensures that there is enough power to support all
P2ZCIMs in a chain.