User manual

CHAPTER 2: INSTALLATION 19
the Enter key. If you can properly access and operate the chosen CPU, the second-tier Base Unit
is properly installed.
m. Repeat steps c through l for all remaining (if any) second-tier Base Units attached to the master
Base Unit.
n. Edit the names of any server CPUs directly attached to the master Base Unit and verify the master
Base Unit’s configuration as described in steps 6b through 6e of the section Installing a Paragon
II with a Single Base Unit, earlier in this chapter.
Important! If you rearrange a cascaded system or dismantle one and rebuild it
differently later, you must recycle power to each Base Unit in the new cascade. A soft
reset allows each Base Unit to retain all user and system profiles, and to auto-detect
the current status of its channel port and user ports. Follow the installation steps in
this section to install the new cascade, but when you power on each Base Unit (which
must be done in proper tier order, from base tier to upper tier), press the FUNC and the
buttons on the unit’s front panel until “Reset Unit” appears on the LED panel. Press
the ENT button to reset the unit. Starting with a subsidiary Base Unit in the third tier (if
there is one), power on the unit, press FUNC and until the LED panel flashes, then
press the ENT button, and wait until the LEDs cycle through and return to their original
state. Repeat for any other third-tier units, then all second-tier units, and finally the
master unit.
Installing the Paragon P2-UMT832S Stacking Unit
1. Connect power cord to a Stacking Unit.
2. Connect one end of a stacking cable to "Expansion Port Out" on the back of the Stacking Unit.
Connect the other end of the cable to "Expansion Port" on the Main Switching Unit.
3. Power ON all Paragon UMT units.
4. On the front panel LCD of the Main Switching Unit:
a. Press the FUNC button and use the and keys to select "Stacking Support." Press the ENT
button.
b. Select the total number of Stacking Units (3 units maximum) and press the ENT button.
5. On the front panel LCD of the Stacking Unit:
a. Press the FUNC button and use the and keys to select "Set Stack ID." Press the ENT button.
b. Assign the Stacking Unit ID using the and keys. Each Stacking Unit MUST HAVE A
UNIQUE ID (1-3).
6. Press the ENT button (sequential order is not necessary).
7. Power OFF all units.
8. Power ON the Stacking Unit.
9. Power ON the Main Switching Unit.
Installing the Paragon P2-UMT1664S Stacking Unit
1. Connect power cord to a Stacking Unit.
2. Connect one end of a stacking cable to "Expansion Port Out A" on the back of the Stacking Unit.
Connect the other end of the cable to the lower "Expansion Port In" on the Main Switching Unit.
Connect one end of the other stacking cable to “Expansion Port Out B” on the back of the other
Stacking Unit. Connect the other end of the cable to the upper “Expansion Port In” on the Main
Switching Unit.
3. Power ON all Paragon UMT units.
4. On the front panel LCD of the Main Switching Unit:
a. Press the FUNC button and use the and keys to select "Stacking Support." Press the ENT
button.
b. Select the total number of Stacking Units (1 unit maximum) and press the ENT button.
5. On the front panel LCD of the Stacking Unit:
a. Press the FUNC button and use the and keys to select "Set Stack ID." Press the ENT button.