User guide
Chapter 15: Power Control
209
Associations Power Control
Choose Power Control > Associations Power Control to access the tool
to manage power control associations.
Note: When executing power on/off operation, about ~5 seconds are
added to the configured sequential interval, resulting in an operational
delay time (minimum amount of time to operate). If power cycle is
selected, all associated outlets will be powered off sequentially, and then
powered on sequentially. The cycle delay time reacted here determines
the minimum length of time needed to turn back on the outlets after
they're shut down, which is user-specified by administrator. The delay
time to experience would be operational delay + user-specified delay.
Note: If you are connecting a PX to the Dominion SX, it is recommended
you set the power cycle time to 5 seconds.
Note: If you disconnect the Dominion PX after creating an association in
SX, the association would appear empty until you re-plug-in the PX into
the same port.