Owner's manual
Table Of Contents
- Chapter 1: Introduction
- Chapter 2: Accessing CC-SG
- Chapter 3: Configuring CC-SG with Guided Setup
- Chapter 4: Creating Associations
- Chapter 5: Adding Devices and Device Groups
- Chapter 6: Configuring Nodes and Interfaces
- Chapter 7: Adding and Managing Users and User Groups
- Chapter 8: Policies
- Chapter 9: Configuring Remote Authentication
- Chapter 10: Generating Reports
- Audit Trail Report
- Error Log Report
- Access Report
- Availability Report
- Active Users Report
- Locked Out Users Report
- User Data Report
- Users in Groups Report
- Group Data Report
- AD User Group Report
- Asset Management Report
- Node Asset Report
- Active Nodes Report
- Node Creation Report
- Query Port Report
- Active Ports Report
- Scheduled Reports
- CC-NOC Synchronization Report
- Chapter 11: System Maintenance
- Chapter 12: Advanced Administration
- Appendix A: Specifications (G1, V1, and E1)
- Appendix B: CC-SG and Network Configuration
- Appendix C: User Group Privileges
- Appendix D: SNMP Traps
- Appendix E: Troubleshooting
- Appendix F: Two-Factor Authentication
- Appendix G: FAQs
- Appendix H: Keyboard Shortcuts

180 COMMANDCENTER SECURE GATEWAY ADMINISTRATOR GUIDE
Create a New Task
To schedule a new task:
1. On the Administration menu, click Tasks. The Task Manager screen appears
Figure 183 Task Manager
2. Click New.
3. In the Main tab, type a name (1-32 characters, alphanumeric characters or underscores, no
spaces) and description for the task.
4. Click the Task Data tab.
5. Click the Task Operation drop-down menu and select the task to be scheduled, such as
Upgrade Device Firmware, from the list. Note that the fields requiring data will vary
according to the task selected.
6. Click the Recurrence tab.
7. In the Period field, click the radio button that corresponds to the period of time at which you
want the scheduled task to recur.
• Once: Use the up and down arrows to select the Start time at which the task should
begin.
• Periodic: Use the up and down arrows to select the Start time at which the task should
begin. Type the number of times the task should be executed in the Repeat Count field.
Type the time that should elapse between repetitions in the Repeat Interval field. Click
the drop-down menu and select the unit of time from the list.
• Daily: Click the radio button next to Every day if you want the task to repeat 7 days per
week. Click the radio button next to Every weekday if you want the task to repeat each
day from Monday through Friday.
• Weekly: Use the up and down arrows to select how many weeks should elapse between
task executions, then check the checkbox next to each day on which the task should recur
each week that it runs.
• Monthly: Type the date on which the task should execute in the Days field, and then
check the checkbox next to each month in which the task should recur on the specified
date.










