Owners manual

2
3/8” HEX
HEAD NUT
3/8” FLAT
WASHER
3/8” LOCK
WASHER
4. Drill 3/8” holes in top of Bed. Stud
marks can be center punched so drill will
not slip.
5. Place Plastic Oval Gasket in position
between Side Rail and Bed.
7. Fasten Rails to truck using one (1)
3/8” Flat Washer, one (1) 3/8” Lock
Washer and one (1) 3/8“ Hex Head Nut.
DO NOT OVER TIGHTEN. Maximum tie
down capacity perbed rail is 50lbs.
6. Place Rails with Inserted Studs
through holes.
4x 4x
PLASTIC
OVAL GASKET
4x
INSERTED
STUDS
3/8” DRILL BIT
4x
Rev 5