Operation Manual

en-52
6 CONTROLS
NOTE:THE OPERATOR MUST BE SEATED TO ENABLE LIFT / LOWER FUNCTIONS.
6.2K RIGHT HAND UNIT LIFT/LOWER SWITCH _________________________________
To lower the cutting unit move the switch lever forward.
To raise the cutting unit move the switch lever rearwards
NOTE:
If the PTO is engaged when the unit is lowered the green led
will illuminate when the unit is below 400mm from the
ground.
The yellow PTO LED will illuminate when the reel is rotating.
If the lever is pulled momentarily rearwards the unit will raise
to the cross cut position and continue to rotate for 3
seconds. Lowering the unit within 3 seconds will let the reel
continue rotating without stopping.
If the lever is held and the unit lifts above the cross cut position the
unit will continue to lift and the reel will stop rotating at 400mm. The lift will stop when the lever is released.
6.2L CENTRE UNIT LIFT/LOWER SWITCH _____________________________________
To lower the cutting unit move the switch lever forward.
To raise the cutting unit move the switch lever rearwards
NOTE:
If the PTO is engaged when the unit is lowered the green
led will illuminate when the unit is below 400mm from the
ground.
The yellow PTO LED will illuminate when the reel is
rotating.
If the lever is pulled momentarily rearwards the unit will
raise to the cross cut position and continue to rotate for 3
seconds. Lowering the unit within 3 seconds will let the reel
continue rotating without stopping.
If the lever is held and the unit lifts above the cross cut position the unit will continue to lift and the reel will stop
rotating at 400mm. The lift will stop when the lever is released.