Operation Manual
en-25
7 OPERATION
7.3.3 HYDRAULIC 5/7 STANDS ______________________________________________
1. The Hyd 5/7 should be mounted/stored on the stands
supplied (A).
7.3.4 CONNECTING THE THREE POINT LINKAGE ______________________________
1. Reverse the tractor upto the Hyd 5/7.
2. Connect the Lower Link Arms (A).
3. Connect the Top Link. (B) The Top Link should be
positioned on the tractor to limit the movement of the
draft control. Also check for adequate clearance
between Hyd 5/7 hydraulic tank and top link when the
Hyd 5/7 is lowered.
7.3.5 CONNECTING THE PTO _______________________________________________
1. Connect the PTO to the Tractor and the Hyd 5/7
Mk4.(A). The PTO is fitted with an overrun clutch
that must be fitted at the tractor end.
2. Secure the guards with PTO safety chains (B).
These should be attached to the Tractor PTO guard
and the Hydraulic 5/7 PTO guard.