Specifications

5
1. Installation
Minimum Clearances: SmartSteam Boilerless
Steamer requires the following minimum
clearances to any surface, combustible or non-
combustible.
 
 
 
Steam Free Zone: The SmartSteam Boilerless
Steamer can be damaged by steam from
external sources. Do not install the steamer
over a steam venting drain. Ensure that steam is
not present in an area bounded by the footprint
of the steamer and a circle 18 inches in radius
about the right rear corner of the steamer (see
gure below).
Install and operate the gas appliance in a well
ventilated area. Adequate air must be supplied to
replenish the air used for combustion. Installation
must conform with local codes and/or with the
Naitonal Fuel Gas Code, ANSI Z223.1/NFPA-54
(latest edition) or the National Gas and Propane
Code CSA B149.1 as applicable.
Any item which might obstruct or restrict the ow of
air for combustion and ventilation must be removed.
Do not obstruct the ue cover or rear vents after
installation.
THE AREA DIRECTLY AROUND THE APPLIANCE
MUST BE CLEARED OF ALL COMBUSTIBLE
MATERIAL. FAILURE TO FOLLOW THESE
INSTRUCTIONS CAN CAUSE BODILY INJURY
AND/OR PROPERTY DAMAGE.
The steamer must be disconnected from the gas
supply system during any pressure testing of that
system which has test pressures in exxcess of
1
/
2
PSI (3.45 kPa).
2. Electrical Supply Connection
Provide 115 VAC, 60 HZ, 1 PH, 15 AMP
service. Bring wire in through hole in the lower
left back panel. Each cavity requires a separate
cord for connections. Local codes and/or the
National Electrical Code should be observed in
accordance with ANSI/NFPA 70. AN
ELECTRICAL GROUND IS REQUIRED.
The wiring diagram is located in the service
compartment and in this manual. Maximum load
is 2
1
/
2
AMPs. In Canada, provide electrical
service in accordance with the Canadian
Electrical Code, CSA C22.2 Part 1 and/or local
codes.
3. Gas Supply Connection
Connection to the gas supply shall be in
accordance with the chart below.
OM-SSB-3G/5G/10GF
Installation and Startup
WARNING
THE UNIT MUST BE INSTALLED BY PERSONNEL WHO ARE QUALIFIED TO WORK WITH GAS,
ELECTRICITY AND PLUMBING. IMPROPER INSTALLATION CAN CAUSE INJURY TO PERSONNEL
AND/OR DAMAGE TO THE EQUIPMENT. THE UNIT MUST BE INSTALLED IN ACCORDANCE WITH
APPLICABLE CODES. THE UNIT MUST BE INSTALLED BY A LICENSED PLUMBER OR GAS FITTER
WHEN INSTALLED WITHIN THE COMMONWEALTH OF MASSACHUSETTS.
CAUTION
DO NOT INSTALL THE UNIT WITH THE REAR VENTS BLOCKED OR WITHIN 2 INCHES OF A HEAT SOURCE
SUCH AS A BRAISING PAN, DEEP FAT FRYER, CHARBROILER OR KETTLE.
TO AVOID DRAINAGE PROBLEMS, LEVEL THE UNIT FRONT TO BACK, OR PITCHED SLIGHTLY TO
THE REAR.
NPT Pipe Size Required
1
/
2
1
/
2
1
/
2
1
/
2
3
/
4
3
/
4
SSB-Steamer
SSB-3G
(2)SSB-3G
SSB-5G
(2)SSB-5G
SSB-10G
(2)SSB-10G
18 -inch
radius
SMARTSTEAM
(top view)
457 mm