Specifications

E. Installation Checklist
After the final location of the unit has been determined refer to the following
checklist prior to start up:
1. Check all exposed refrigeration lines to ensure that they are not kinked, dented or
rubbing together.
2. Check that condenser and evaporator fans rotate freely without striking any
stationary members.
3. Unit must be properly leveled.
4. Plug in unit and turn on main on/off switch.
5. Turn on cold control located inside the base.
6. Refer to the front of this manual for serial number location. Please record this
information in your manual on page 3 now. It will be necessary when ordering
replacement parts or requesting warranty service.
7. Confirm that unit is holding temperature. Set controls to desired temperature for
your particular ambient and altitude (See figure A.).
8. Allow your unit to operate for approximately 2 hours before putting in food this
allows interior to cool down to storage temperature.
Note: All motors are oiled and sealed.
Note: All self-contained models are shipped from the factory with the service valves
open ready for operation.
13