Figure 4-1: Recommended Piping for Combination Heating and Cooling (Refrigeration) System
4 Water Boiler Piping and Trim (continued)
To perform a long term pressure test including
the boiler, ALL trapped air must first be
removed from the boiler.
A loss of pressure during such a test, with no
visible water leakage, is an indication that the
boiler contained trapped air.