Technical data

54
7. OPERATION
7.1. Controls (Fig.6)
1 Main switch.
Two-position switch with led.
Turn on the switch, led on, the machine is turned
(apart from the boiler) and the pump is turned on
WR¿OOWKHERLOHU
2 Boiler resistance switch.
Two-position switch with led.
On activating the switch, the led comes on, and
power is supplied to the resistance for the boiler
water.
3 Coffee dispenser switch (mod. S1 - S1 TANK)
On pressing the button, continuous coffee dispen-
sing begins and the led comes on.
2QUHSUHVVLQJWKHVZLWFKWKHFRIIHHGHOLYHU\VWRSV
and the led goes out.
4 Electronic coffee delivery button panel.(mod.
E1). Five buttons with relative led:
A Press the button for a second, led on, release
EXWWRQDVPDOOFRIIHHLVGLVSHQVHG
The led turns off and dispensing ceases.
B Press the button for a second, led on, release
WKHEXWWRQWZRVPDOOFRIIHHVDUGLVSHQVHGIURP
the same unit.
The led turns off and dispensing ceases.
C Press the button for a second, led on, release
WKHEXWWRQDELJFXSRIFRIIHHLVGLVSHQVHG
The led turns off and dispensing ceases.
D Press the button for a second, led on, release
WKHEXWWRQWZRELJFXSVRIFRIIHHDUHGLVSHQVHG
from the same unit.
The led turns off and dispensing ceases.
E Press the button for a second, led on, release
WKHEXWWRQFRIIHHLVFRQWLQXRXVO\GLVSHQVHG
Press the button for a second, led off, release
EXWWRQFRQWLQXRXVGLVSHQVLQJRIFRIIHHFHDVHV
7RLQWHUUXSWGLVSHQVLQJWDNLQJSODFHE\SUHVVLQJ
A-B-C-D, hold button E down until the relative
led turns off.
5 Hot water supply tap
Tap: turn in an anticlockwise direction to open and
clockwise to close.
6 Steam supply handwheel.
Tap: turn in an anticlockwise direction to open and
clockwise to close.
7.2. Control instruments (Fig.6)
7 GaugeZLWKPRELOHQHHGOHRQD¿[HGGLDOZLWKD
scale and colour indicator areas.
Visual control of the boiler pressure.
8 Boiler water level indicator
9 Tank water level indicator (Mod.S1 TANK)
6.2. Connections
L Place the machine on the horizontal sur-
IDFHSUHYLRXVO\SUHSDUHG
%HIRUHFRQQHFWLQJWKRURXJKO\ZDVKWKHPDLQVZDWHU
pipes:
L/HDYHWKHZDWHUVXSSO\WDSVUXQQLQJDWIXOOSUHV-
sure for several minutes.
L&RQQHFWWRWKHPDLQVZDWHUVXSSO\
L Connect the machine to the socket.
7KRURXJKO\ZDVKDOOWKHZDWHUSLSHVRIWKHPDFKLQH
L/HDYHWKHZDWHUVXSSO\WDSVUXQQLQJDWIXOOSUHV-
sure.
L6ZLWFKRQPDLQVZLWFKZDLWXQWLOWKHERLOHU¿OOV
up to the level set.
L Switch on main switch 2 to begin heating the water
in the boiler.
L Operate each unit in order to allow the water to
HVFDSHIRUDERXWRQHPLQXWHUHSHDWWKHRSHUDWLRQ
twice.
L Deliver steam from the steam jets for about one
minute.
L'HOLYHUKRWZDWHUIRUDERXWRQHPLQXWHUHSHDWWKH
operation twice.
L Switch off switches 1 and 2.
L(PSW\WKHZDWHUIURPWKHERLOHUVHHSRLQW
IMPORTANT
Should the machine not deliver water for over
24 hours, wash the internal components be-
fore beginning work, repeating the operations
as described above
ATTENTION
Please be informed that in order to avoid
SUHVVXUHIDOOVGXULQJWKHERLOHU¿OOLQJZH¿WWHG
LQWRWKH¿OOLQJVROHQRLGYDOYHDUHVWULSWLRQ
1.25 mm.
If, during the installation, the machino get in
security mode (the on/off selection on the
WRXFKSDGZLOOÀDVKUHVHWWKHPDFKLQHXVLQJ
the main switch.
,QERWKFDVHVLWLVQHFHVVDU\WRSURYLGHDQDXWRPDWLF
differential switch (Fig. 6) at the start of the power
cable, complete with magnetic release elements in
DFFRUGDQFHZLWKWKHLGHQWL¿FDWLRQSODWHGHWDLOV)LJ
1). The contacts must have an opening of equal or
over 3 mm and with dispersed current protection of
30 mA.
5HPHPEHUWKDWHDFKPDFKLQHPXVWEH¿WWHGZLWKLWV
RZQVDIHW\HOHPHQWV
WARNING:
Should the power supply cable be damaged
it is to be replaced by the manufacturer or by
its technical assistance service or by person
ZLWKHTXLYDOHQWTXDOL¿FDWLRQLQRUGHUWRSUH-
vent any risks.