Operating instructions

- Section 6: Page 22 -
This form is to be completed by the service technician performing the Preventative Maintenance visit.
CHECKLIST FOR PM TYPE 2:
INCLUDES ALL OF TYPE 1 PLUS THE FOLLOWING:
BREW GROUP ASSEMBLY
Replaced shower screens on upper and lower pistons
HOT WATER BOILER
Brew Valve
Inspected and cleaned brew valve
Replaced coffee valve plunger - (PN 054055)
Replaced and lubricated O-rings to brew valve assembly
(PN: 043366)
COFFEE BOILER EXPANSION VALVE
Replaced pressure relief valve - (PN 054055)
STEAM BOILER
Inspected and cleaned the level sensor
---> Recommended Decalcifi cations YES or NO (please circle)
STEAM WAND
Cleaned steam wand and exchanged steam wand tip seal
(PN: 040501)
CHECKLIST FOR PM TYPE 1
BREW GROUP ASSEMBLY (BGA)
Replaced BGA with new or rebuilt BGA
OR.....
If you changed O-rings on site please check the following
Lubricated and replaced upper piston O-rings
Lubricated and replaced lower piston O-ring
Cleaned shower screens on upper and lower
pistons
GRINDERS
Inspected grinders
Cleaned hoppers
OUTLETS AND STEAM WAND
Ran automatic coffee cleaning program
Cleaned tea outlet
Cleaned steam wand
WATER FILTRATION AND SOFTENING SYSTEM
Tested water hardness before installing
softening and fi ltering system
--> Water Hardness is: GPG
Replaced water fi ltration and softening
cartridges
Tested water hardness before installing
softening and fi ltering system
--> Water Hardness is: GPG
Please complete and return form to verify that a preventative maintenance visit was performed.
RETURN TO:
Service Technician Name (Please Print)
Signature of Service Technician
Additional Notes/Comments:
CUSTOMER INFORMATION SERVICE TECH INFORMATION
COMPANY NAME TECHNICIANS NAME
LOCATION, CITY, STATE COMPANY NAME
DATE PHONE NUMBER
TOTAL CYCLES PERFORMED E-MAIL
CLEANING CYCLES PERFORMED PM VISIT TYPE
1 or 2 (please circle)
C
YCLES SINCE LAST PM (P-SERV)
T
IME TO COMPLETE PM
hours mins
MACHINES SERIAL NUMBER
6.6 PM GUIDE: CHECKLIST AND SIGN-OFF SHEET