Operating instructions
6.6 PM GUIDE
- Section 6: Page 20 -
EGRO 55 SERIES TECHNICAL MANUAL
13. INSPECT STEAM BOILER
13.1 Inspect the level sensor for calcium build-up, by removing it from the boiler. To remove it from the boiler loosen the
locking nut and remove the complete level sensor sub-assembly. Decalcify if necessary
--> TOOL: 12mm wrench
STEPS FOR PM TYPE 2
PLEASE NOTE: If you do not have a new or rebuilt BGA, and are following the alternative steps for on-site
O-ring exchange, please also exchange the brew shower screens instead of cleaning them.
--> Shower Screen Part Number: 060116
PERFORM ALL THE STEPS NECESSARY FOR PM TYPE 1 PLUS FOLLOWING STEPS!
12. REPLACE COFFEE BOILER EXPANSION VALVE
12.1 Replace pressure relief valve
--> PN: 055757
--> TOOLS: 14 and 17mm wrenches
11. PERFORMANCE MAINTENANCE ON COFFEE BOILER
Coffee Boiler Valve
11.1 Inspect and clean coffee valve. Recommend decalcifi cation if needed
11.2 Replace coffee valve plunger
--> PN 054055
--> TOOLS: 12, 17, and 22 mm wrenches
11.3 Replace and lubricate O-ring to coffee valve
--> PN: 043366
CAUTION: Be sure that there isn’t any steam pressure in the boiler! See Step 1 for more information
!
!
Coffee
Boiler
Steam
boiler
11
11.2
12










