Operation Manual
Connect Master Valve
Connect an optional Master Valve to the ESP-Me
controller.
CAUTION: Do not route the master valve wires
through the same opening as the power wiring.
1 2 3 4
VT = VALVE TEST
VT MV COM
24 VAC
GND
SENS
VT MV COM 5 6 7 11 12 13 17 18 19
1 2 3 4 8 9 10 14 15 16 20 21 22
CONNECT
120 VAC
MASTER
VALVE
POWER COMMON
Wiring Connections
Connect the valve wires for each station and for a
(optional) Master Valve, Pump Start Relay or Rain
Sensor.
Connect Valves
CAUTION: Do not route the valve wires through the
same opening as the power wiring.
1. To perform a Valve Test- connect the common wire
to the “COM” terminal and the power wire to the “VT”
terminal. This will immediately turn the valve “ON” .
WARNING: The “VT” terminal is always powered
“ON”.
1 2 3 4
VT = VALVE TEST
VT MV COM
24 VAC
GND
SENS
VT MV COM 5 6 7 11 12 13 17 18 19
1 2 3 4 8 9 10 14 15 16 20 21 22
CONNECT
120 VAC
POWER
STATION 1
VALVE
STATION
2 VALVE,
ETC.
COMMON
1.
8
8
Installation
ESP-Me User Manual










