Installation Guide
rainharvesting.com
6e. Attach the valve at the union and orientate
dial for easy access.
6f. Remove the waterproof cover from the
Electronic Release Valve.
6g. Ensure the reset interval and drain time control knobs are in the "RESET" and "CLOSED" positions.
Carefully slide out the battery box and install two new 1.5-volt AAA batteries.
6h. Test the unit by turning the drain time knob to the "OPEN" position. You should hear the sound of the
motor within 5 seconds. Turn the drain time knob back to the "CLOSED" position ready for setting.
NOTE: If you do not hear the sound of the motor, check that the batteries are installed correctly.
O-ring
"Reset" "Closed"
"Open"
"Closed"
MOTOR
OPERATING










