Installation Guide

Insllion
Lef Eer Srem Hood cover
Lef Eer Srem body
Lef Eer Srem screen
Tpe mesure
Mrker pen
Sw
WHAT’S IN THE BOX?
WHAT’S IN THE BOX? TOOLS/MATERIALS YOU MAY REQUIRE LEAF EATER STREAM WITH THE HOOD INSTALLATION
300mm
FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4
1. Loce he posiion  which you wn o insll your Lef Eer Srem rin hed. This
my be direcly under your guer/eve or mid-wy down your vericl downpipes.
Wherever you choose o insll i, your Lef Eer Srem rin hed mus be  minimum
of 500mm bove your nk inle nd nk overlow pipe. Also noe h if you’re inslling
 Lef Eer Srem wih The Hood, you will need o choose n insllion locion h
llows you o perform more frequen minennce.
2. Cu your downpipe where you wn he boom oule of he Lef Eer Srem rin hed o
si. Cu he upper secion of pipe bou 300mm bove he irs cu (Figure 1). Ensure ll cu
edges re clen nd smooh.
3. Remove he cover from your Lef Eer Srem nd slide i up he op pipe, holding i in
posiion (Figure 2).
4. Wih he oher hnd, i he Lef Eer Srem body ono he lower secion of pipe,
ensuring he oule is seed irmly ino posiion (Figure 3).
5. Slide he cover bck down he op pipe nd lower he boom skir ino he corresponding
chnnel beween he screen nd body (Figure 4).
6. If desired, you cn pin your rin hed o mch your downpipes nd/or building.
HOW IT WORKS
The Hood elimines splshing for mximum rinwer cchmen, while keeping pess nd
leves from your sysem wih is 955 micron mesh screen.