Full Product Manual

Table Of Contents
Gather Site Data Page 17
SITE DATA WORKSHEET
Site Information
Eve. Phone
Water Source
Notes
Yes No
Yes No
Soil Type
Coarse
Medium
Fine
Name
Address
City
Contact
Day Phone
Pipe Requirements
Specs on File
Permits required?
Cost
City Water
Well:
Surface Water
Effluent
Water Purveyor
Contact
Phone
Meter Location
Meter size (inches)
Service Line Type and Size
Static Pressure (PSI at meter)
Elevation change (± feet)
Good
Fair Poor
Water Quality:
HP
PSI GPM
Sub Centrifugal
State Zip
Climate and PET
Cool Humid
Warm Humid
Hot Humid
Cool Dry
Warm Dry
Hot Dry
Worst case daily PET (in. per day):
Application Efficiency (%):
Hydrozones
(Attach sketch of property)
DESCRIPTION
DENSITY
#
IRRIGATION METHOD
DATE
JOB NUMBER
John & Wendy Doyle
7836 Connor Lane
John
Brighton
CA
92867
City of Brighton
Dolores Martinez
714-555-2591
1. Turf
2. Turf
3. Turf
4. Turf
5. Dwarf cypress
rotors
spray heads
sparse
n/a
n/a
n/a
n/a
sparse
sparse
sparse
spray heads
spray heads
low-volume
low-volume
low-volume
low-volume
low-volume
low-volume
6. Dwarf cypress
7. Mixed G.C. & shrubs
8. Shrubs
9. Vegetables
10. Shrubs/containers on porch
Hydrozone 9, vegetable
garden, not yet planted.
714-555-8136 714-555-1089
W side, S of front walk
5/8"
60 PSI
N/A
3/4" copper
Look at Figure 3-4: Sample Site Data Worksheet above that has been partially
completed for this property. Using this worksheet, complete the items below.
1. Section 4 of the Worksheet indicates that the climate is “Warm Dry.” What is
the actual worst-case daily PET for this type of climate, according to Table 3-
4? Fill in this figure on the sample Site Data Worksheet.
2. What is the application efficiency for a low-volume system in a Warm Dry
climate according to Table 3-4? Fill in this figure on the sample Site Data
Worksheet.
3. Hydrozone 7 is completely covered with ground cover. It also includes
shrubs and trees. Enter your best estimate of the hydrozone’s density on the
sample Site Data Worksheet.
4. Hydrozone 9 will be a vegetable garden when it is planted. What density do
you think should be used to plan for this hydrozone? Enter your estimate on
the sample Site Data Worksheet.
Suggested answers for these four items can be found on the last page of this
chapter. Check your answers with this answer key.
Site Data
Figure 3-4: Sample Site Data Worksheet—Doyle Residence
®