Full Product Manual

Table Of Contents
Page 94 Appendix D
FLOW RATE WORKSHEET
Use the worksheet below to determine the flow rate for your system:
To Get This: Do This: Calculations Totals
1. Length of tubing in feet: Determine the total length in feet from grid
2. Length of tubing in inches: Multiply feet by 12 to get inches
3. No. of emitters in the zone: Divide length by emitter spacing (12", 18", 24")
4. Total no. of emitters: Round up to next whole number
5. Flow rate in GPH: Multiply no. of emitters by flow rate (0.6 or 0.9 GPH)
6. Flow rate in GPM: Divide GPH by 60 to get gallons per minute
LATERAL LINE SPACING WORKSHEET
Use the worksheet below to determine the space between lateral lines for your system:
To Get This: Do This: Calculations Totals
1. Width of the planted area Measure the width in feet
2. Width of planted area in inches: Multiply feet by 12 to get inches
3. Actual width of the grid: Subtract edge offset (multiply 2 x 2 = 4)*
4. No. of spaces between laterals: Divide grid width by emitter spacing (12", 18" or 24")
5. Actual no. of spaces: Round up to the next whole number
6. Actual space between lateral lines: Divide grid width by number of spaces in grid
7. No. of lateral line rows in the grid: Add one to no. of spaces
* The edge offset is 2" from hardscape and 4" from non-hardscape.
®