User's Manual Part 1
Table Of Contents
- Table of Contents
- List of Figures
- List of Tables
- Chapter 1
- Chapter 2
- Chapter 3
- Chapter 4
- Link Installation: The RADWIN Manager
- Installing theRADWIN Manager Application
- Starting the RADWIN Manager
- Login Errors
- Continuing without an IP Address
- Installing the Link: First steps
- Installing the Link: Overview
- Installing the Link: Step 1, Start the Wizard
- Installing the Link: Step 2, System Parameters
- Installing the Link: Step 3, Channel Settings
- Installing the Link: Step 4, Tx Power and Antenna Settings
- Installing the Link: Step 5, Services
- Installing the Link: Step 6, Installation Summary and Exit
- Link Installation: The RADWIN Manager
- Chapter 5
- Configuring the Link
- Link Configuration: Getting Started
- Configuring the Link: Overview
- Configuring the Link: Step 1, Start the Wizard
- Configuring the Link: Step 2, System Parameters
- Configuring the Link: Step 3, Channel Settings
- Configuring the Link: Step 4, Tx Power and Antenna Settings
- Configuring the Link: Step 5, Services
- Configuring the Link: Step 6, Configuration Summary and Exit
- Configuring the Link
RADWIN 1000/2000/5000 User ManualVersion 2.6.50p1 xi
FIGURE 5-11 ANTENNA CONFIGURATION DIALOG WITH OPENED TYPE SELECTION .........................5-19
F
IGURE 5-12 SERVICES AND RATES DIALOG.........................................................................5-20
F
IGURE 5-13 CONFIGURATION WIZARD EXIT SUMMARY..........................................................5-21
F
IGURE 5-14 MAIN WINDOW OF THE MANAGER AFTER CONFIGURATION ......................................5-22
F
IGURE 6-1 CONFIGURATION DIALOG BOX ............................................................................6-2
F
IGURE 6-2 AIR INTERFACE DETAILS....................................................................................6-3
F
IGURE 6-3 CHANGING THE TRANSMIT POWER.......................................................................6-4
F
IGURE 6-4 MANAGEMENT ADDRESSES - SITE CONFIGURATION DIALOG BOX..................................6-5
F
IGURE 6-5 CONFIGURING MANAGEMENT TRAFFIC VLAN SETTINGS .............................................6-6
F
IGURE 6-6 DATE AND TIME CONFIGURATION........................................................................6-8
F
IGURE 6-7 CHANGE DATE AND TIME ..................................................................................6-8
F
IGURE 6-8 DATE AND TIME CONFIGURED FROM AN NTP SERVER...............................................6-9
F
IGURE 6-9 BRIDGE CONFIGURATION - SITE CONFIGURATION DIALOG BOX .................................6-10
F
IGURE 6-10 INVENTORY SCREEN .....................................................................................6-13
F
IGURE 6-11 AVAILABLE SECURITY FEATURES.......................................................................6-14
F
IGURE 6-12 CHANGING THE COMMUNITY STRING ................................................................6-16
F
IGURE 6-13 ALTERNATIVE COMMUNITY DIALOG BOX ............................................................6-17
F
IGURE 6-14 EXTERNAL ALARM CONFIGURATION ..................................................................6-18
F
IGURE 6-15 TELNET MANAGEMENT SCREEN .......................................................................6-22
F
IGURE 7-1 GET DIAGNOSTICS DIALOG BOX .........................................................................7-2
F
IGURE 7-2 PREFERENCES DIALOG BOX.................................................................................7-5
F
IGURE 7-3 BASIC PERFORMANCE MONITORING REPORT ..........................................................7-6
F
IGURE 7-4 A TYPICAL PERFORMANCE MONITORING REPORT .....................................................7-6
F
IGURE 7-5 THRESHOLD CONFIGURATION DIALOG BOX .............................................................7-9
F
IGURE 7-6 EVENTS LOG DISPLAY.....................................................................................7-10
F
IGURE 7-7 PREFERENCES DIALOG BOX...............................................................................7-12
F
IGURE 7-8 ACTIVE ALARMS SUMMARY ..............................................................................7-15
F
IGURE 7-9 ONLINE HELP FOR RADWIN 1000/2000/5000 ..................................................7-17
F
IGURE B-1 EXAMPLE FOR CONNECTING THE ALARM CONNECTOR................................................ B-4
F
IGURE C-4 MOUNTING ON A POLE..................................................................................... C-2
F
IGURE C-5 MOUNTING ON A WALL ................................................................................... C-3
F
IGURE D-1 ACCESSING THE LINK BUDGET CALCULATOR ......................................................... D-4
F
IGURE D-2 LINK BUDGET SCREEN..................................................................................... D-5
F
IGURE D-3 PRODUCT SELECTOR ....................................................................................... D-7
F
IGURE D-4 RATE SELECTOR............................................................................................. D-8
F
IGURE D-5 CALCULATION OF DISTANCE FROM SITE COORDINATES............................................ D-9
F
IGURE D-6 CLIMACTIC C FACTORS.................................................................................. D-10
F
IGURE D-7 CLIMACTIC C FACTOR DESCRIPTION ................................................................. D-11
F
IGURE D-8 WORLD MAP SHOWING C FACTOR CONTOURS ..................................................... D-12
F
IGURE D-9 FRESNEL ZONE ............................................................................................ D-13
F
IGURE E-1 GROUNDING ANTENNA CABLES ............................................................................E-2
F
IGURE E-2 GROUNDING A TYPICAL POLE INSTALLATION ...........................................................E-3
F
IGURE E-3 GROUNDING A TYPICAL WALL INSTALLATION...........................................................E-4
F
IGURE E-4 ODU SURGE SUPPRESSOR AND GROUNDING ..........................................................E-4
F
IGURE E-5 TRANSTECTOR’S SURGE SUPPRESSOR ...................................................................E-5
F
IGURE E-6 SURGE SUPPRESSOR AND GROUNDING AT BUILDING ENTRY POINT................................E-7
F
IGURE F-1 ACTIVATING AN ODU - INACTIVE LINK .................................................................F-2
F
IGURE F-2 AIR INTERFACE DIALOG BOX...............................................................................F-3
F
IGURE F-3 THE LOCAL ODU AFTER ACTIVATION - PROBING .....................................................F-4
F
IGURE F-4 BOTH SITES ACTIVATED AND AWAITING CONFIGURATION ...........................................F-5
F
IGURE F-5 CHANNEL SELECT DIALOG BOX - ACS PERMANENTLY ENABLED ....................................F-6
F
IGURE F-6 FCC/IC 5.4/5.3 GHZ OPERATIONAL ...................................................................F-7
F
IGURE G-1 TOP LEVEL SECTIONS OF THE PRIVATE MIB ......................................................... G-3
F
IGURE J-4 MONTAGE SUR UN PYLÔNE ................................................................................. J-5
F
IGURE J-5 MONTAGE SUR UN MUR ..................................................................................... J-6










