User's Manual

Chapter 2
Installation and Setup
2.1 Introduction
This section describes the installation, alignment, and setup
procedures for a WinLink1000 system.
After installing the hardware and establishing a link, refer to
Chapter 3
for operation instructions and
Chapter 4
for configuration instructions.
In case a problem is encountered, refer to
Chapter 5
for test and
diagnostic instructions.
Warning
Internal settings, adjustment, maintenance, and repairs may be
performed only by a skilled technician who is aware of the hazards
involved.
Always observe standard safety precautions during installation,
operation, and maintenance of this product.
2.2 Site Requirements and Prerequisites
For the IDU units, allow at least 90 cm (36 in) of frontal clearance for
operating and maintenance accessibility. Allow at least 10 cm (4 in)
clearance at the rear of the unit for signal lines and interface cables.
The ambient operating temperature should be –45 to 60°C/–49 to
140°F (ODU), or –5 to 45°C/23 to 113°F (IDU) at a relative humidity of
up to 90%, non-condensing.
2.3 Package Contents
The WinLink1000 packages include the following items:
ODU package contains:
9/18/2006 2:26:00 PM Package Contents 2-1