User's Manual

WinLink User and Installation Guide Version 1.795 3-22
Installation Sequence
The following steps are required to install the WinLink system:
1. Install the management program on the network management
station/laptop. See Installing the WinLink Management Software,
page 3-24.
2. Mount the ODU at each site (and antenna if external antenna is
used). See Mounting the ODU, page 3-25.
3. Connect the ODU to the IDU at both sites. See page 3-27.
4. Connecting the Ground to the IDU, IDU-C, PoE-8, page 3-28.
5. Connect the power. See Connecting Power to an IDU, page 3-29,
and Connecting Power to an O-PoE, page 3-29
6. Align the ODU/antennas. See page 3-30.
7. Run the Installation wizard from the management program. See 3-
31.
8. Connect user equipment to the local and remote IDUs. See page 3-
35.










