User's Manual
Table Of Contents
- WinLink(TM) 1000 Rev 3.0
- Notice
- Quick Start Guide
- Contents
- List of Figures
- List of Tables
- 2 Installation and Setup
- 3 Configuration
- 4 Operation
- 5 Diagnostics and Troubleshooting
- A Wiring Specifications
- B Mast and Wall Installation
- C Link Budget Calculator
- D TDM Clock Configuration
- Index
WinLink 1000 Installation and Operation Manual Chapter 5 Diagnostics and Troubleshooting
PM Troubleshooting 5-7
Table
5-2. Troubleshooting with WinLink 1000 LEDs
Led Status Remedy
PWR Off Check that AC adapter is connected to the IDU
and the AC power outlet.
IDU Orange Check that the IDU/ODU cable is properly wired
and connected.
ODU Red Check that the IDU/ODU cable is properly wired
and connected.
Orange Complete the installation procedure from the
management software.
AIR I/F
Red Check the ODU Antenna alignment. Check that
the radio configuration of both site A and site B
units are the same (channel and SSID).
Off Check the TDM service configuration in the NMS.
Orange Check that the system is not in loopback mode.
Check the site B IDU ports and cables and site B
external equipment.
SERVICE
Red Check the site A IDU ports, cables and external
equipment.










