User's Manual

Table Of Contents
WinLink 1000 Installation and Operation Manual Chapter 2 Installation and Setup
Installation and Setup 2-3
WinLink 1000 Manager installation CD
Spare RJ-45 Connector
IDU-E Package Contents:
IDU-E
110V/240V adaptor
IDU wall-mounting drilling template
Spare RJ-45 connector
(Optional) IDU-C Package Contents:
IDU-C
For AC model, 110v/240 VAC with 3-prong connector cable
For DC model, –24VDC or -48 VDC with 3-pin terminal block
connector (green)
IDU standard 1-U, 19” carrier rack
Spare RJ-45 connector
External antenna (if ordered)
ODU/IDU Cable at length ordered (optional)
2.4 Installation and Setup
Physical installation of the WinLink 1000 system installation includes
the following steps:
1. Installing ODU at both sites of the link.
2. Installing ODU cable and connecting ODU to IDU at both sites.
3. Connecting power.
4. Installing the management program on the network management
station.
5. Aligning the ODUs.
6. Running the Installation wizard from the management program.
7. Connecting user equipment to the local and remote IDUs.