Installation and Operation Manual Appendix F Hub Site Synchronization
The HSS is supplied with ten protective covers; any port not in use
must be closed with a protective cover.
Figure
F-3. HSS Interconnection Unit
Note
Ensure that the collocated units are connected in sequence from SYNC
1. If an ODU is removed form the hub site, then all remaining ODUs
must be reconnected to maintain the connectivity.
Æ
To connect an ODU to the HSS
1. Unscrew the protective cover from the port marked SYNC 1.
2. Connect the RJ-45 connector from one end of the prepared CAT 5e
cable to SYNC 1.
3. Connect the other end of the CAT 5e cable to the ODU connector
labeled SYNC.
4. Tighten the protective seal that is on the prepared cable over the
RJ-45 connector.
5. Repeat for all ODUs that are to be collocated at the hub site. The
next ODU to be connected is inserted to SYNC 2, followed by SYNC
3 and so on.
F.3 Architecture
One of the collocated ODUs at the hub site acts as the Hub Sync Master
(HSM); all the other collocated units are Hub Sync Clients. The Hub
WinLink 1000 Architecture F-3