User's Manual Part 1
Installation and Operation Manual Quick Start Guide
6. Secure the ODU and ground cables to the mast or brackets using
cable ties.
7. Repeat the procedure at site B.
Æ
To align the ODU:
1. Connect power to the site A IDU.
After approximately 20 seconds the ODU beeper starts beeping.
This is normal.
2. Verify normal operation of the IDU by the LED indications on the
front panel.
Indicator Color Status
PWR Green ON
IDU-E Orange
Green
ON for short duration during startup
ON during normal operation
ODU Green ON shows normal operation
AIR I/F Orange
Green
ON for short duration during startup
ON shows normal operation
SERVICE Green ON shows normal operation
OFF when Service is configured for
Ethernet only
Cau ion t
Do not stand in front of a live outdoor unit, see Appendix H
3. Align the site A ODU in the direction of the site B ODU.
4. Connect power to the site B IDU.
WinLink 1000 Installing the WinLink 1000 Units 3










