User's Manual Part 1
Chapter 3
Operation
This section provides the following information for WinLink 1000:
• Operating procedures (turning-on and turning-off)
• IDU indicators
• Normal Indications
• Default settings
• Managing the WinLink 1000
3.1 Turning On WinLink 1000
Æ
To turn on WinLink 1000:
• Connect the AC/DC converter to the IDU power connector and to
the mains. See
Chapter 2
for full instructions on connecting the
power.
The PWR indicator lights up (IDU-E only) and remains lit as long
as the IDU is receiving power.
WinLink 1000 requires no operator attention once installed, with the
exception of occasional monitoring of front panel indicators and
statistics data. Intervention is only required when WinLink 1000 must
be configured to its operational requirements, or diagnostic tests are
performed.
3.2 Controls and Indicators
IDU Front Panel Indicators
The front panel of the IDU and IDU-E includes a series of LED
indicators that show the operating status of the unit.
Figure
3-1
shows
Controls and Indicators 3-1










