Installation Guide
Table Of Contents
- Installation Guide
- Table of Contents
- List of Figures
- Chapter 1: Introduction
- Chapter 2: Site Installation
- 2.1 Scope of This Chapter
- 2.2 Wayside
- 2.3 On-board
- 2.4 Grounding
- Appendix A: Antenna Guidelines
- Appendix B: Terminology
- Appendix C: Revision History
FinMInstallationGuide DQ0266070/A.01 1‐2
TransportationFiberinMotionOverview Introduction
Figure1‐1:FiberinMotionOverview
TheFiberinMotionsolutionworksasfollows:
A. TBS(TransportationBaseStation)unitsareinstalledonpolesorwalls,andareequippedwithantennas(usually4).
B. TheTBSunitsareconnectedtothebackhaulnetwork(GigabitethernetviaRJ45orfiberoptic)andpower,
C. AllTBSunitsaresynchronizedtothesameclocksource.
(A)
(B)
(D,F,G)
(B,C)
(E)
tobackhaulnetwork,
ISUs/OSUs
topowersource
FOR REGULATORY REVIEW