FinMInstallationGuide DQ0266070/A.01 2‐31
LightningProtectionUnit(LPU) SiteInstallation
TheLPUhastwocableglandsonthebot tomforCAT‐5e/6cables,inadditiontoagrounding
lug.OnthesideoftheLPUisaslotforthemetaltiewheninstalledonapole,asshownin
Figure 2‐60andFigure 2‐61:
ToinstallanLPUonapole:
1. Choosealocationascloseaspossibletotheradiounit.
2. InsertthemetaltiethroughtheslotsasshowninFigure 2‐61.MakesuretheLPUis
orientedinthecorrectdirection,asshowninFigure 2‐62.
Figure2‐62:LPUattachedtopolewithmetaltie
3. Tightenthemetaltie.
4. Connectthegroundinglugtoagroundingsource.
5. Removethecableglands.
6. ThreadtheCAT‐5e/6cablesthroughthecableglands,andconnectthecable stothe
LPUasshowninFigure 2‐63.