Instruction Manual
Table Of Contents
- 1. INTENDED USE
- 2. PRECAUTIONS
- 3. WARRANTY CONDITIONS
- 4. MAIN DIMENSIONS
- 5. DESCRIPTON OF CONNECTORS
- 6. UNPACKING AND ASSEMBLY
- 7. GETTING STARTED
- 8. LOGGING ON
- 9. SCALE WINDOW DISPLAY
- 10. WEIGHING PROCEDURE
- 11. WINDOW NAVIGATION
- 12. PRODUCT CHOICE
- 13. CHOICE OF A CONTRACTOR
- 14. CHOOSING A PACKING
- 15. STORE CHOOSING
- 16. LOT CHOOSING
- 17. LOT 2 CHOOSING
- 18. QUANTITY NUMBER CHOOSING
- 19. DATABASES
- 20. COUNTING PIECES
- 21. TRANSACTIONS
- 22. STATISTICS
- 23. WEIGHING RECORDING
- 24. PROGRAMMABLE BUTTONS
- 25. LOGGING OFF
- 26. CHECKWEIGHING THRESHOLDS
- 27. PROGRAM’S OPTIONS
- 29. WEIGHING PARAMETRES SETTING
- 30. ERROR MESSAGES
- 31. LABEL DESIGNING
- 32. DIAGRAMS OF CONNECTION CABLES
- 33. CONNECTORS
- 34. SPECIFICATION OF ADDITIONAL MODULES
- 35. ADDITIONAL EQUIPMENT
- 36. TECHNICAL PARAMETERS
- 37. APPENDIX A – SETTING A BARCODE SCANNER

34.1.4. The way of installing inside PUE 5
Module is designated for assembly inside terminal PUE5. Module with
address 1 is assembled to main board of terminal to J13(Slot 0), module
with address 2 is assembled to connector J11 (Slot 1). For the second
module MW-02 gland is installed on casing lid, 3m cable ended with
insulated conductors is led through gland.
Installing procedure:
1. Unplug the terminal (remove the plug from socket 230V);
2. Unscrew the casing lid (back part of terminal casing);
3. Install the module in connector J13 or J11 on main board, depending on
it’s address
;
Installation of the module MW-02 on the motherboard terminal PUE 5
- 121 -