Installation guide

2
How to Prepare for SCOPIA Elite 5100 Series MCU Installation | 3
RADVISION | Installation Guide for SCOPIA Elite 5100 Series MCU Version 7.5
How to Prepare for SCOPIA Elite 5100 Series MCU
Installation
Perform procedures in this section to prepare the site and the SCOPIA Elite 5100 Series MCU
chassis for installation.
About Site Preparation......................................................................... page 3
Unpacking the SCOPIA Elite 5100 Series..................................................... page 4
Verifying the Contents ......................................................................... page 5
Inspecting for Damage ......................................................................... page 5
About Site Preparation
Prior to installing the SCOPIA Elite 5100 Series MCU, you need to verify that your site is suitable
for the MCU. Read this section to learn about the product technical specifications and site
requirements. Ensure to make necessary changes in case you find that the site does not meet any
of the requirements described in this section.
Power system:
Input: 90-264VAC
Power supply: single 400W AC supply
Max. power consumption: DC 335W (50°C) AC 392VA (50°C)
Heat dissipation: 1145 BTU/Hr (50°C)
Mechanical characteristics:
Chassis size (W×H×D): 448mm×44mm×480mm (17.6"×1.73"×18.9")
Rack mount size: 1U×482.6 mm (19")
Weight: ~13kg (~28.7Lbs)
Environmental requirements:
Operating Temperature: 0 C° to 45 C° (32 F to 113 F)
Humidity: 5% to 90% non-condensing