User guide

'Initial Configuration' | 31
RADVISION | Administrator Guide for SCOPIA XT1000 Version 2.0
Step 3 Set PODS to output to Yes.
Step 4 Select Monitor > General.
Step 5 Set Number of Monitors to HD2.
Step 6 Press Save.
Upgrading to the XT1000 with Embedded MCU
Procedure
Step 1
Purchase the MCU4 or MCU9 option.
Note: We recommend purchasing the High Bandwidth Option (12Mbps) when using the
embedded MCU. If the High Bandwidth option is not enabled, the MCU will send out a
lower resolution according to the standard 4Mbps total bandwidth.
Step 2 Enable the license as explained in Installing and Enabling an Option License page 13.
Step 3 Set up a call to check how the system works.