User's Manual

MC-Series ©2008 RadioFrame Networks, Inc. 3-7
Proprietary and Confidential Information
MC-Series Standard Capacity system998-1019-01 Rev X1
Installing T1/E1 cabling
Installing a GPS antenna system
Installing facility alarms
3.4 iDEN Configuration
Plan to set up the MCSC system according to the base radio (BR) parameters
specified in the site datafill for the site, including 800E MHz, sectorization, enclosure,
position and Quad. Corresponding parameters will be set using the System Manager
iDEN Configuration page during system set up (refer to Section 5.2 (System Setup)).
For more information about site datafill parameter settings, refer to the iDEN OMC-R
Configuration Management Parameters Technical Manual, 68P80802E10.
3.4.1 Cabinet and Position Settings
Before bringing up the system, configure the cabinet and position settings to
match the datafill BR settings. For more information, refer to section 5.2 (System
Setup).
3.4.2 BRs
The MCSC system supports EBRC configurations. An MCRB can be assigned
multiple EBRCs or a Quad or partial Quad.
The MCSC system also supports EBRCs configured with adjacent channels.
Instead of configuring a quad BR in the datafill, configure EBRCs using adjacent
channels (each adjacent BR is assigned a separate cabinet/position).
3.4.3 Sectorization
In an omni (single-sector) configuration, all RadioBlade transceivers are assigned
to the same sector (Group A). In a 2- or 3-sector configuration, each group (A, B,
or C) may be assigned to a different sector. All RadioBlade transceivers within the
group must be assigned to the same sector—multiple groups can be assigned to
the same sector, but multiple sectors cannot be assigned within the same group.
3.5 Site Inspection
Following all construction work, both exterior and interior, the site and facility shall be
in a suitable condition for the installation of communications equipment.
Grounding
Consideration should be exercised when laying out a site to allow primarily for all
code requirements for spacing, and then the most efficient use of space. Special
attention shall be given to future expansion with regard to cable runway heights,
electrical outlet placement, and equipment placement.