3.2.9 Alarm Blocks
Various alarms or sensors are installed within the site building. All alarm wiring
terminates at the Environmental Alarm System (EAS) location within the cabinet.
All alarm wires shall be tagged and labeled with the appropriate alarm item. All
contacts will be normally closed, dry and isolated from ground. All alarm wiring
shall be two-wire, 22 AWG.
3.2.10 Environmental Alarm System (EAS)
Plan to implement EAS alarm blocks, wiring and sensors as required depending
on the installation:
If the MCSC system cabinet is deployed as a standalone unit (i.e., as the
only cabinet in the area), plan to provide standard facility environmental
sensors, wiring and connections.
The enclosure comes with a 66 block mounted internally. Therefore you can
install the EAS alarms on the block in the MCSC system cabinet along with
the high-temperature and low-temperature sensors.
Plan to provide conduit or other wire routing from the enclosure to the door
sensor, HVAC units, and AC power failure / surge arrestor failure sensors.
3.3 Scheduling / Logistics
Procure all non-RadioFrame Networks hardware. Refer to procurement
documentation regarding procurement of iSCIII, EAS and CSU.
1. Procure the materials identified in section Site Planning required by technicians
to complete the installation.
2. Initiate the contracts necessary to engage outside contractors to complete the
installation work necessary, including any design or engineering work
necessary for seismic areas. Any installation requiring seismic certification
requires a formal design and installation package from an architect skilled in this
area.
3. Follow standard RF Operations and Site Development procedures for
scheduling
a. All installation activity.
b. All necessary datafill work.
Planning should now be complete for the following tasks:
Securing the MCSC system cabinet to the mounting surface
Installing AC or DC power cabling and DC powerplant
Installing grounding