3.1 Pre-Installation Requirements
Prior to installation, prepare the site with all associated antennas, phone lines, and
other related site equipment.
3.2 Site Planning
For each of the ensuing site planning subsections, complete the following:
1. Identify work to be completed by technicians and outside contractors.
2. Create a list of materials to be used by technicians in completing the work.
3. Create statements of work (SOWs) for work to be completed by outside
contractors.
3.2.1 Space Requirements
Establish the specifications to meet National Fire Protection Associations (NFPA)
Code and American Society of Heating, Refrigerating and Air Conditioning
Engineers (ASHRAE) standards.
3.2.2 Anchoring
Bolting the MC-Series to the floor is required. The MC-Series should NEVER be
placed on casters or wheels of any kind.
Refer to FIGURE for the anchoring bolt template for the MC-Series electroRack
enclosures.