User's Manual

MC-Series Outdoor Pole Mount Users Guide998-5005-01 Rev X1
MC-Series ©2007 RadioFrame Networks, Inc. 6-5
CONFIDENTIAL AND PROPRIETARY
6.3.1 RF Shelf Replacement Procedure
1. Power down RadioFrame Networks equipment in the following order using
circuit breakers on the PDU:
a. ABIC
b. DRBS
c. RF shelf
2. Disconnect cabling from the back of the chassis to be replaced.
Refer to Appendix C (OPM iDEN Microcell Cabinet Stack-Up Configuration).
Index letters are keyed to the figures in this appendix.
a. Disconnect the cabling from the rear of RF Shelf. (Figure 6.1 is indexed
to the cabling figures in Appendix C (OPM iDEN Microcell Cabinet
Stack-Up Configuration).)
Table 6.2 Cables to Disconnect from Rear of RF Shelf (See NOTE)
3. Remove the 4 front mounting screws and remove the RF shelf from the
Cabinet, and then package it for shipment.
Index Disconnect From To Type
H RF Shelf x: power
PDU: RF x
power
A RF Shelf x: ground
GND BAR
ground
U-A RF Shelf x: Tx IN A
DRBS 1: Tx A
RF cable
S-A RF Shelf x: Rx OUT A
DRBS 1: Rx A
RF cable
L RF Shelf x: TX 800E OUT
TOR: Tx 800E x
RF cable
I RF Shelf x: RX 800E IN
TOR: RF 800E x
RF cable
T RF Shelf x: ALARM
DRBS: ALARM INPUT A
serial