a. Secure the PDU to the Cabinet mounting rails using the four mounting
screws provided with the unit.
b. Tighten the screws to 4.5 Nm (40 in-lb).
2. Reconnect all power connections to the back of the PDU.
3. Follow Power supply and battery manufacturer's installation and maintenance
documentation to install power to PDU.
4. Using the breakers on the PDU, turn up the ABIC and DRBS and verify that the
components are operational before proceeding.
a. Wait approximately 3 minutes for the following indicators:
DRBS:
• The STATUS LED for each group will turn green in this order: A and then
C.
• The RADIOBLADE TRANSCEIVER STATUS LEDs will turn red and then
green for each present RadioBlade transceiver. If no RadioBlade
transceiver is present, the LED will not light. To verify the contents of the
DRBS, pull out the shelf (powering off is not required) and inspect the
RadioBlade transceivers and their respective status LEDs. Reinsert the
DRBS. To do this, press up on one side rail locking arm and press down
on the other side rail locking arm, and then push the unit into the Cabinet.
For an illustration of the locking arms, refer to Figure 6.13.
ABIC CRIC
• The POWER and STATUS LEDs will turn red and then green. All other
ABIC card LEDs will turn green.
5. Using the breaker on the PDU, turn up each RF Shelf and then verify that each
RF Shelf is operational before proceeding. The POWER and ALARM LEDs on
the front of the RF Shelf will turn green.
6. Complete the procedures in sections 2.2 (System Setup) and Appendix D
(Functionality Test Procedures).