User's Manual

MC-Series System Installation & Testing
Appendix H: BER Test Procedure
RadioFrame Networks, Inc.
145
H.3 Equipment Disconnection
Disconnect equipment after completing the BER testing.
1 Disconnect the R2660 from the Rx port under test.
2 Display the RBS Status page, and verify that all RadioBlade status icons are green.
3 Disconnect the network cable from port 8 of the BIC CRIC.