User's Manual

MC-Series System Installation & Testing
Final Checkout and Commissioning
RadioFrame Networks, Inc. 47
5 Final Checkout and Commissioning
The procedures in this chapter describe procedures for conducting final checkout for each portion
of the MC-Series System. This chapter's describes procedures for:
Prerequisites
Checkout procedures
Final checkout setup
Initial power
System setup
System verification
Functionality test
5.1 Prerequisites
Ensure that the following has taken place:
The T1 is live and has been tested
The datafill has been completed, including BR cabinet and position assignments, and
conforms to the recommended datafill shown in section 6.3 Recommended Datafill
Parameters
Site configuration is available
All cabling and installation work has been completed and all punchlist items corrected
Required Tools:
R2660 Series Communication System Analyzer
Digital RF meter
Laptop computer to bring up the MC-Series System. At a minimum, the laptop must be
loaded with the following fully functional equipment (or equivalent):
Pentium II / 233MHz (Pentium III / 500 MHz recommended, or better)
128MB of memory (256MB recommended)
10GB hard drive (64MB disk drive space minimum available for software)
12x (or faster) CD-ROM (USB memory stick with 64MB recommended)
Windows 98 (Windows 2000 Professional or better recommended)
Internet Explorer 5.5 (no Mozilla)
One Ethernet port and one 9-pin serial port
6-foot CAT5 (or 5e/6) Ethernet cable (EIA/TIA 568B) to connect to the BIC CRIC
Straight-through, male-to-female serial cable (DB9/RS232)
50 ohm terminating loads for all RF ports to be used according to the site configuration