Installation Guide
Table Of Contents
- Title
- Contents
- Introduction
- System Description
- Pre-Installation
- Receipt of Equipment
- Site Planning
- Main Rack and Supporting Hardware
- Remote ACUs
- RFUs
- RadioBlades
- RAPs
- URU
- Interconnecting Cabling
- Main Rack Configuration
- RF Planning
- Site Survey
- Alarm Configuration
- Tools Required
- Installation
- Equipment Commissioning
- iDEN Interface
- Power Plant
- RadioFrame System
- Coverage Validation
- Site Acceptance Guidelines
- RadioFrame System Functionality Test
- RadioFrame System iDEN Functionality Test
- Interconnect & Dispatch Setup & Voice Quality
- Packet Data Service Connection and Latency
- Short Message Service
- Handover and Cell Reselection
- Interconnect Connection Stability and SQE Performance
- Dispatch Connection Stability
- Idle SQE Testing and Validation
- System Self-Recovery Test
- Packet Data Stability and Throughput
- Validation of ‘Unable to Key BR’ Alarm
- Rectifier & AC Power Alarms
- iSC-3 Functionality Test
- RadioFrame System iDEN Functionality Test
- Connecting the RFS to the Customer LAN
- Operations and Maintenance
- Appendixes
RadioFrame System
Equipment Commissioning
RFN_3.1 Beta 85
7 Select OK.
5.3.2 Navigating the System Configuration
The System Configuration displays icons representing each component included
in the RFS starting with the NCU (see the following illustration). In the following
example, one ACU is connected to the NCU: ACU0 is connected to the NCU via
rear port 1. Generally, ACU0 is the ACU located in the main rack, while ACU1
through ACU7 are remote ACUs. Configuration information for the NCU is
displayed on the left side of the page, including the device name and IP address.
1 To view configuration information for an ACU, select its icon.
A page similar to the NCU page appears displaying configuration information
for the selected ACU and icons for each RFU connected to the ACU. In the
same way you can view the status of each iDEN RadioBlade installed in
every RFU in the RFS by selecting an RFU icon.
2 To return to a previous page, select the component pathname shown at the
top of the tab (System Configuration>NCU>ACU…).
3 To return to the NCU, select the System Configuration tab at any time.