Installation Guide
Table Of Contents
- Title
- Contents
- Introduction
- System Description
- Pre-Installation
- Receipt of Equipment
- Site Planning
- Main Rack and Supporting Hardware
- Remote ACUs
- RFUs
- RadioBlades
- RAPs
- URU
- Interconnecting Cabling
- Main Rack Configuration
- RF Planning
- Site Survey
- Alarm Configuration
- Tools Required
- Installation
- Equipment Commissioning
- iDEN Interface
- Power Plant
- RadioFrame System
- Coverage Validation
- Site Acceptance Guidelines
- RadioFrame System Functionality Test
- RadioFrame System iDEN Functionality Test
- Interconnect & Dispatch Setup & Voice Quality
- Packet Data Service Connection and Latency
- Short Message Service
- Handover and Cell Reselection
- Interconnect Connection Stability and SQE Performance
- Dispatch Connection Stability
- Idle SQE Testing and Validation
- System Self-Recovery Test
- Packet Data Stability and Throughput
- Validation of ‘Unable to Key BR’ Alarm
- Rectifier & AC Power Alarms
- iSC-3 Functionality Test
- RadioFrame System iDEN Functionality Test
- Connecting the RFS to the Customer LAN
- Operations and Maintenance
- Appendixes
RadioFrame System
Installation
RFN_3.1 Beta 75
Figure 25 Connect the RFU to the ACU, then ensure that the RFU is receiving
power and connectivity from the ACU.
4.4.3 Insert the RadioBlades and RAPs into the RFU
The iDEN RadioBlades and 802.11 RAPs are shipped several to a box in
individually wrapped antistatic packaging. Each box of RadioBlades/RAPs
includes a disposable antistatic wrist strap to be used when inserting the
RadioBlades/RAPs into the RFU. Refer to the site documentation for the exact
slot location of each RadioBlade/RAP within the RFU.
1 Unwrap 30 cm (12”) of the disposable wrist strap and wrap the adhesive side
around your wrist.
2 Unroll the rest of the band and remove the liner from the copper tape.
3 Attach the copper tape to the metal card cage inside the RFU.
4 Un-package the iDEN RadioBlades to be inserted in the RFU.
5 Insert the iDEN RadioBlades, one at a time, into the specified slots (1 through
7) in the RFU until the connector on each RadioBlade seats firmly into the
back of the RFU (see the following illustration).
6 Unscrew the antenna from each iDEN RadioBlade, one at a time, and place
the antennas on an antistatic surface (see the second following illustration).