Installation Guide
Table Of Contents
- Title
- Contents
- Introduction
- System Description
- Pre-Installation
- Receipt of Equipment
- Site Planning
- Main Rack and Supporting Hardware
- Remote ACUs
- RFUs
- RadioBlades
- RAPs
- URU
- Interconnecting Cabling
- Main Rack Configuration
- RF Planning
- Site Survey
- Alarm Configuration
- Tools Required
- Installation
- Equipment Commissioning
- iDEN Interface
- Power Plant
- RadioFrame System
- Coverage Validation
- Site Acceptance Guidelines
- RadioFrame System Functionality Test
- RadioFrame System iDEN Functionality Test
- Interconnect & Dispatch Setup & Voice Quality
- Packet Data Service Connection and Latency
- Short Message Service
- Handover and Cell Reselection
- Interconnect Connection Stability and SQE Performance
- Dispatch Connection Stability
- Idle SQE Testing and Validation
- System Self-Recovery Test
- Packet Data Stability and Throughput
- Validation of ‘Unable to Key BR’ Alarm
- Rectifier & AC Power Alarms
- iSC-3 Functionality Test
- RadioFrame System iDEN Functionality Test
- Connecting the RFS to the Customer LAN
- Operations and Maintenance
- Appendixes
RadioFrame System
Pre-Installation
RFN_3.1 Beta 33
Main Rack Clearances
BACK 36”
FRONT 36”
SIDES 36”
ABOVE 36”
Equipment Dimensions System Unit
Width Depth Height
RadioFrame System NCU 19” 13” 7”
ACU 19” 13” 7”
iDEN Interface iSC-3 (1) 17” 9” 1.75”
iSC-3 (2) 17” 9” 1.75”
EAS 17” 15” 1.75”
CSU 19” 12.5” 1.75”
Power Plant Rectifier 19” 12.5” 5.25”
Battery 19” 20” 14”
3.3.2.1 Back
System Unit Back Clearance
RadioFrame System NCU 7”
ACU 7”
iDEN Interface iSC-3 (1) 7”
iSC-3 (2) 7”
EAS 7”
CSU 7”
Power Plant Rectifier 7”
Battery 7”
3.3.2.2 Front
System Unit Front Clearance
RadioFrame System NCU 12”
ACU 12”
iDEN Interface iSC-3 (1) 12”