Installation Guide
Table Of Contents
- Title
- Contents
- Introduction
- System Description
- Pre-Installation
- Receipt of Equipment
- Site Planning
- Main Rack and Supporting Hardware
- Remote ACUs
- RFUs
- RadioBlades
- RAPs
- URU
- Interconnecting Cabling
- Main Rack Configuration
- RF Planning
- Site Survey
- Alarm Configuration
- Tools Required
- Installation
- Equipment Commissioning
- iDEN Interface
- Power Plant
- RadioFrame System
- Coverage Validation
- Site Acceptance Guidelines
- RadioFrame System Functionality Test
- RadioFrame System iDEN Functionality Test
- Interconnect & Dispatch Setup & Voice Quality
- Packet Data Service Connection and Latency
- Short Message Service
- Handover and Cell Reselection
- Interconnect Connection Stability and SQE Performance
- Dispatch Connection Stability
- Idle SQE Testing and Validation
- System Self-Recovery Test
- Packet Data Stability and Throughput
- Validation of ‘Unable to Key BR’ Alarm
- Rectifier & AC Power Alarms
- iSC-3 Functionality Test
- RadioFrame System iDEN Functionality Test
- Connecting the RFS to the Customer LAN
- Operations and Maintenance
- Appendixes
Method of Procedure
Appendix B: Site Survey
142 RFN_3.1 Beta
Customer Expectations (continued)
Troubleshooting expectations?
Other
RF Planning
Which and how many channels will be provided for indoor use?
Coverage requirements (see RF Measurements below)
Vertical coverage required?
Site WLAN
What is the internet connectivity?
WLAN configuration?
Mobile IP?
Static/administration of IP?
24 X 7 point of contact
RFS Equipment Requirements
Cable path from iSC
Wall mount or ceiling mount of RFUs preferred?
iSC Equipment
iSC location
Power requirements
Rack size