Installation Guide
Table Of Contents
- Title
- Contents
- Introduction
- System Description
- Pre-Installation
- Receipt of Equipment
- Site Planning
- Main Rack and Supporting Hardware
- Remote ACUs
- RFUs
- RadioBlades
- RAPs
- URU
- Interconnecting Cabling
- Main Rack Configuration
- RF Planning
- Site Survey
- Alarm Configuration
- Tools Required
- Installation
- Equipment Commissioning
- iDEN Interface
- Power Plant
- RadioFrame System
- Coverage Validation
- Site Acceptance Guidelines
- RadioFrame System Functionality Test
- RadioFrame System iDEN Functionality Test
- Interconnect & Dispatch Setup & Voice Quality
- Packet Data Service Connection and Latency
- Short Message Service
- Handover and Cell Reselection
- Interconnect Connection Stability and SQE Performance
- Dispatch Connection Stability
- Idle SQE Testing and Validation
- System Self-Recovery Test
- Packet Data Stability and Throughput
- Validation of ‘Unable to Key BR’ Alarm
- Rectifier & AC Power Alarms
- iSC-3 Functionality Test
- RadioFrame System iDEN Functionality Test
- Connecting the RFS to the Customer LAN
- Operations and Maintenance
- Appendixes
RadioFrame System
Equipment Commissioning
RFN_3.1 Beta 93
Conduct an onsite walk through to verify that the following Site Development
Punch List items have been properly installed. This inspection ensures that the
site installation meets quality standards.
• Grounding
- buss bar OK (optional)
- NCU/ACU rack(s)
- rectifier rack
- battery shelf (GNB)
• Peco II Rectifier Voltages (measured voltages)
- float voltage
- equalize voltage
- high voltage
- low voltage
- low voltage pickup
- low voltage drop out
• Battery Information (for batteries 1 through 8)
- Plant voltage
- Measured voltage
- connections corroded
- terminals greased
- signs of leakage
• Main Rack
- EAS revision complete
- CSU grounded
- 5 MHz ‘A’ split with ‘T’
- 5 MHz ‘B’ split with ‘T’
• T1 Information, Primary and Secondary
- T1 circuit ID#
- T1 surge arrestor installed/grounded
- T1 repeater shelf / cfl cabinet location
- T1 level at extended demarc (RJ48 x jack)
• Summary
- log book at site with recent entry
- outstanding issues/punch list items for site
- defective equipment found/replaced
5.5.2 Site As-Built Acceptance Test Procedures
Complete the test procedures described in this section to record the site as built.