Introduction
2 RadioFrame Networks, Inc.
Task Responsible Party
Prepares system design and quotes Customer
Provides Project Management, including site survey Customer
Constructs site, including racks, ironwork (ceiling support,
ladder racks, etc.), AC power, DC power, and battery
backup systems.
Customer
Lays conduit and cable, installs new fiber raceways, and fire
stopping after cables have been laid.
RFN Certified Integration Partner
Installs, tests, and commissions RadioFrame Networks
equipment, including site acceptance.
RFN Certified Integration Partner
Maintains RadioFrame Networks equipment, including
logbook.
Customer
1.1.2 Site Documentation
The following documents are required for installing, commissioning, testing, and
maintaining RadioFrame Networks equipment. Some or all of this documentation will be
left on site. In addition, a logbook will be stored on site that will be used for tracking all
changes, updates, and maintenance work done on RadioFrame System equipment.
Document
Site Survey
Pre-Installation Checklist
Equipment Inventory
Site Acceptance Test
Equipment Functionality Acceptance Test
Site As-built
Alarms
Alarm Procedures
1.1.3 Reference Documents
The following documents are intended to supplement the information contained in this
manual.
RadioFrame System Field Guide, RadioFrame Networks, 998-1000-00
RF Planning Guidelines, RadioFrame Networks, 990-1001-00
Customer Release Notes, RadioFrame Networks, 991-1000-00
National Electrical Code (NEC), current edition