User's Manual
GSM/802.11b RadioFrame System Method of Procedure
Final Checkout
RadioFrame Networks, Inc.
69
• Rack position (BCUs and ACUs only)
• Card position (APCs and BPCs only)
• RFU location (including floor and sector)
• GSM RadioBlade and iRAP slot positions in RFU
• MAC Address
• IP Address
• Channel (RAPs only)
• Port connections between RFS components
5.5.3.2 Cabling Pathways
A schematic showing the route of each cable run at the site. For each cable run, list the
following:
• Cable length
• Cable type
• Connector types (both ends)
• Cable labeling completed per specs
• Port Connections
• Continuity test results
• Distance test results
5.5.3.3 Floor Plan/Site Drawing
Use a floor plan or site drawing to denote the location of the following on each floor of the
building:
• Main rack
• Remote ACUs, including power source
• RFUs
5.5.4 RadioFrame System Acceptance Test
During installation, each component of the RFS is verified for power and connectivity.
Assuming that each component (BCU, ACU, and RFU) has been properly installed and is
receiving power, double check that all Power, Status, Link and Activity LEDs throughout
the system are lit and are green. For any other condition on any system component or
connection, refer to section 7.3 Corrective Maintenance for troubleshooting procedures.