User's Manual

RadioFrame System Method of Procedure GSM/802.11b
Appendix B: Site Survey
102 RadioFrame Networks, Inc.
RFS Equipment Requirements (continued)
ACU
ACU location
Power requirements
4U 19” rack space available per ACU?
Cable run distance from BCU
RFU
Wall mount?
Above ceiling panels available? If so, which floors?
Power Requirements
120VAC or –48VDC available?
UPS required?
Installation Requirements
Cable and Path Requirements
Plenum rated cable required?
Innerduct required?
Conduit required?
Existing vertical access between floors?
Space available for additional new cable in existing stubs and/or conduit?
Core drill required?
Dedicated CAT-5 (or higher) available?
Ceiling Type